The construction of 82 new apartments and 15,000 Sq Ft of cinema space with the condition of retaining the cinema’s locally listed Art Deco façade.

See More
Sector:

Private Residential

status:

PC Q3 2024

Value:

£21,900,000.00

Programme Period:

26 months completed in 24 months.

CHALLENGE:

With the recent change in building regulations and the introduction of the BSR regulations, the design was reconfigured mid-way through the project. As such we introduced a secondary staircase to serve the larger section of the project. Notwithstanding all the above challenges, Boulevard Construction were able to complete the project 2 months ahead of programme.